CASE STUDY / TATA MARCOPOLO
When one plant slows, the next needs to know.
Designing shared production visibility across 17 sequential manufacturing plants.

THE PROBLEM
Tata Marcopolo’s 17 plants followed a sequential production flow. Each plant depended on the one before it. When a delay happened upstream, downstream teams often did not know in time. Some plants waited while others faced sudden workload spikes.
MY ROLE AND LEADERSHIP
I contributed to presales and led the UX and service design direction with one junior designer. I worked with operations and leadership to understand the production flow, align the experience with factory-floor realities, and shape what each plant needed to know.
THE KEY INSIGHT
Planning was not failing because teams lacked intent. They lacked a shared, timely view of what was happening upstream.
THE DESIGN STRATEGY
We shaped an always-on display for each plant instead of separate dashboards. It showed bus progress, delays, recurring errors, and quality issues. The information had to be understood at a glance, work for non-technical users, and fit existing operations without complex interaction or heavy training.
SYSTEM AND WORKFLOW DESIGN
Use a clear, shared information structure across plants. Prioritise the information that helps teams understand production status and prepare for the next stage. Keep the display current and easy to read from the factory floor.
BUILDING TEAM OWNERSHIP
I added an employee recognition and leaderboard concept, linking performance and quality with visible recognition.
CONSTRAINTS AND TRADE-OFFS
The design had to fit existing manufacturing operations, support non-technical users, and work without heavy training. We chose always-on shared displays so teams could see production status without using complex tools or interactions.
PILOT AND STATUS
The system was piloted and approved by the team. Our department was dissolved before production rollout. The system did not launch, so production impact was not measured.
WHAT I WOULD MEASURE NEXT
If the rollout continued, I would measure how quickly downstream teams learn about delays, changes in idle time, unplanned workload spikes, quality rework, and whether teams use the displays.